UVA University Hospital Expansion – Renovations

Highlights

UVA University Hospital underwent phased renovations of over 90,000 square feet of existing spaces to support a major expansion. The renovations are spread over 3+ years, more than 15 non-contiguous phases, with numerous sub-phases, and 3 levels of the building.

RBI’s role included:

  • Renovating hospital bed spaces and support/administrative spaces in various phases
  • Upgrading the domestic hot water recirculation system with a new master mixing valve assembly and distribution piping system
  • Installing new medical gas master alarm panels to serve the existing hospital and new expansion per NFPA 99 code requirements, with reporting to building automation control system
  • Upgrading mechanical and plumbing systems (including heating hot water, chilled water, domestic hot and cold, DWV, and medical gasses)

Let's partner on your next project.