Highlights

The Buford Middle School project included a renovation and additional construction of three new building sections to the existing school. Upgrades include new education spaces, additional safety features, better accessibility, a new Geothermal HVAC system, plus overall lighting and energy efficiency upgrades.

RBI’s installation work included:

  • (4) OA units
  • (91) Heat pumps
  • (103) VAV’s
  • (8) Hydronic Pumps
  • (2) Domestic water heat pumps
  • (1) Dry cooler
  • (1) Chiller heat pump
  • Plumbing that includes water closets, lavatories, sinks, and urinals

Nupi piping was used for the HVAC piping