University of Virginia – Helipad Project – Bed Tower Roof
Highlights
A new helipad was constructed on top of the existing UVA Hospital bed tower roof. The project incorporated a new control tower for the function of the helipad.
RBI installation work included:
- Heating and chilled water piping with fan coil units serving helipad control tower
- Fans and charcoal filtration units added to existing air handling unit intake air systems
- Storm drains and piping for helipad platform
- Steam piping to heat exchanger station serving helipad snow melt system